Engineering Design Process – the basis for simple SAS testing
Abstract—During the life cycle of a Substation Automation System (SAS), testing the communication, interlocking logic and proper operation of all signals transmitted to Supervisory Control and Data Acquisition (SCADA) systems take considerable effort and time. In a substation which makes use of IEC 61850 communication, all the engineering and configuration data can be saved in standard format files, the so-called System Configuration Language (SCL) files.
Promoted content: Does social media work for engineers – and how can you make it work for you?
So in addition to doing their own job, engineers are expected to do the marketing department´s work for them as well? Sorry, wait a minute, I know the...