Fail-safe and maintenance-friendly control voltage distributions that can be installed in a time- and space-saving manner are a must for efficient machine and facility operation. With the new Maxguard system, the terminal blocks (previously installed separately) for distributing potential to the outputs of the electronic load monitors become an integral part of a 24 V DC control voltage distribution solution. The new combination of load monitoring and potential distribution saves time during installation, increases safety against failure and reduces the amount of space required on the terminal rail.
‘Archaic rules’ torn up to green light new nuclear
Lack of data about windpower being cheaper than nuclear was, I felt, the question that you replied to. and as the context is energy security it would...