Stately home for planes

The USA's 10th and final Nimitz-class aircraft carrier, George HW Bush (CVN 77), gained a colossal 800 tons last week as Northrop Grumman lowered the upper bow section of the ship into place.

The addition of the upper bow completes the flight deck and extends the overall length of the carrier to its full size, which is as long as the Empire State Building is tall.

Weighing 780 tons and made up of 25 steel sections, the upper bow is one of the heaviest crane lifts in the ship's production plan. Northrop Grumman's Newport News business began construction on the upper bow unit last February.

Newport News is building the George HW Bush using modular construction, where smaller sections of the ship are welded together to form units called super-lifts.

These super-lifts are pre-outfitted and then lifted into the construction dry dock with a 900-ton gantry crane. The upper bow unit is the 155th of 161 super-lifts used to build the carrier. It joins the lower bow section which was set into place in the dry dock nearly a year ago.

Register now to continue reading

Thanks for visiting The Engineer. You’ve now reached your monthly limit of news stories. Register for free to unlock unlimited access to all of our news coverage, as well as premium content including opinion, in-depth features and special reports.  

Benefits of registering

  • In-depth insights and coverage of key emerging trends

  • Unrestricted access to special reports throughout the year

  • Daily technology news delivered straight to your inbox