Electrical arcing discharge in orbiting satellites can cause system failure, but is hard to predict. Engineers at the Russian Institute of High Current Electronics have adopted multiphysics software to find the critical regions where failures originate and to protect onboard equipment.
PMI falls as manufacturers feel the squeeze
17 months or two and a half years - which is it?