When it comes to testing assets in substations and performing comprehensive condition assessments, efficiency is king. To be able to come to informed conclusions about the correct operation and condition of the asset, whilst also keeping outage time to a minimum, all relevant test data must be collected within the shortest possible time and with the least amount of effort. The safety of the test engineers, the tested asset, and the immediate surroundings must be guaranteed at all times.
All of these factors need to work together as smoothly as possible in order to achieve maximum efficiency. Our developer teams are passionate about developing solutions that fulfill these demands and make the procedure as efficient as it can be.
Find out how to maximise efficiency