The
Located near Devil's Bridge in Ceredigion,
The Cefn Croes project is owned by Falck Renewables, a leading European developer of wind projects and a subsidiary of the Falck Group, based in
The new wind farm is operated by Cambrian Wind Energy, a subsidiary of Falck Renewables, and was developed by the Renewable Development Company (RDC). Falck Renewables and RDC are jointly developing more than 500MW of wind energy projects in
The new wind farm, which provides 20% of
PMI falls as manufacturers feel the squeeze
17 months or two and a half years - which is it?