At peak production, the solar panel array will produce more than 525,000 kilowatt hours annually.
Orion Energy Systems designed, installed and will operate, monitor and maintain the array, which comprises more than 3,000 photovoltaic solar panels covering 65,000ft2.
This is not the first environmentally friendly power to supply the brewery, however. A Bio-Energy Recovery System (BERS) has been in place at the Newark facility for more than 15 years, turning the nutrients in the wastewater into biogas that already provides up to 15 per cent of the fuel needed to power the facility’s boilers.
Currently, 10 of Anheuser-Busch’s 12 US breweries use the BERS technology to help fuel operations.
Oxa launches autonomous Ford E-Transit for van and minibus modes
I'd like to know where these are operating in the UK. The report is notably light on this. I wonder why?