Scottish CCS projects could create up to 5,000 jobs
More than 5,000 jobs could be created through the construction and operation of three Scottish Carbon Capture and Storage (CCS) demonstration projects, according to research published today.

The findings have been revealed from an in-depth study by Scottish Enterprise into the economic impact potential of the proposed CCS developments at Longannet, Peterhead and Hunterston.
The proposed facilities, if fully developed, will test and demonstrate the technical and commercial aspects of CCS technology to then allow the deployment of CCS in existing and new fossil-fuel power plants.
The study found that up to 4,600 direct and indirect jobs could be created during the construction phase to 2020, with a further 454 operational jobs supported during the operational lifetime of the demonstration facilities.
Similarly, up to £2.75bn of Gross Valued Added (GVA) could be added to the Scottish economy during construction, with an additional £535m per annum over their operational lifetime.
It has been estimated in separate research that CCS could support up to 13,000 new jobs by 2025, including exporting Scottish-based skills and technology across the world.
Ayrshire Power is proposing to build a multi-fuel power station at Hunterston, North Ayrshire.
Register now to continue reading
Thanks for visiting The Engineer. You’ve now reached your monthly limit of news stories. Register for free to unlock unlimited access to all of our news coverage, as well as premium content including opinion, in-depth features and special reports.
Benefits of registering
-
In-depth insights and coverage of key emerging trends
-
Unrestricted access to special reports throughout the year
-
Daily technology news delivered straight to your inbox
Radio wave weapon knocks out drone swarms
Probably. A radio-controlled drone cannot be completely shielded to RF, else you´d lose the ability to control it. The fibre optical cable removes...