There was a hydrogen explosion on Saturday morning at reactor 1, followed by a similar blast at reactor 3 this morning and the extent of radiation exposure to the surrounding area it is not currently known.
The problems seems to have been caused by the tsunami, rather than the earthquake per se, which damaged the plant’s back-up diesel generators that pump water into the reactor to cool it after automatic shut down.
The Engineer will be covering the situation, but for a breakdown of how reactors are engineered to deal with seismic shaking see Friday’s coverage of the event.
Oxa launches autonomous Ford E-Transit for van and minibus modes
I'd like to know where these are operating in the UK. The report is notably light on this. I wonder why?