New power plant for Crete
Foster Wheeler Energia has been awarded an engineering, procurement and construction contract by Greek electricity utility, Public Power Corporation, for a 100 MWe heavy-oil-fired power plant.

has been awarded an engineering, procurement and construction contract by Greek electricity utility,
(PPC), for a 100 MWe heavy-oil-fired power plant.
The two-train plant, scheduled for completion in early 2008, will be designed and built by Foster Wheeler and its Greek construction partner, Athena, near the city of
The value of Foster Wheeler's scope is approximately €46 million, and was included in the company's third-quarter 2005 bookings. The total value of the award for the consortium is approximately €86 million.
"Foster Wheeler is very pleased to lead the consortium awarded this contract by PPC. This is our Global Power Group's first win in
Register now to continue reading
Thanks for visiting The Engineer. You’ve now reached your monthly limit of news stories. Register for free to unlock unlimited access to all of our news coverage, as well as premium content including opinion, in-depth features and special reports.
Benefits of registering
-
In-depth insights and coverage of key emerging trends
-
Unrestricted access to special reports throughout the year
-
Daily technology news delivered straight to your inbox
Radio wave weapon knocks out drone swarms
Probably. A radio-controlled drone cannot be completely shielded to RF, else you´d lose the ability to control it. The fibre optical cable removes...