GE fulfils Nigerian energy needs
GE Energy will supply four Frame 9E gas turbines for a new, 480-megawatt, simple-cycle power plant in Alaoji, Abia State Nigeria. Installation is scheduled for 2006.

will supply four Frame 9E gas turbines for a new, 480-megawatt, simple-cycle power plant in Alaoji,
.
GE's technology was selected by Rockson Engineering of
Designed for high availability and low maintenance costs, GE says the Frame 9E gas turbines have accumulated more than 14 million hours of utility and industrial service worldwide.
The four GE gas turbines will be manufactured at GE Energy's facilities in
In addition to the gas turbines, the scope of the GE contract includes generators, all major plant accessories, site technical support, performance testing, training and spare parts.
Register now to continue reading
Thanks for visiting The Engineer. You’ve now reached your monthly limit of news stories. Register for free to unlock unlimited access to all of our news coverage, as well as premium content including opinion, in-depth features and special reports.
Benefits of registering
-
In-depth insights and coverage of key emerging trends
-
Unrestricted access to special reports throughout the year
-
Daily technology news delivered straight to your inbox
Radio wave weapon knocks out drone swarms
Probably. A radio-controlled drone cannot be completely shielded to RF, else you´d lose the ability to control it. The fibre optical cable removes...