The three-year project is one of five selected by the US Department of Energy (DOE) to develop monitoring networks for advanced fossil energy power systems.
Algorithms will be developed and tested on a pressure-driven, plant-wide dynamic model of a coal-based integrated gasification combined cycle (IGCC) plant, while a distributed gasifier model will be used to test sensor placement for unit-level condition monitoring.
The result is expected to be an integrated model-based algorithm for sensor placement in an IGCC plant that is robust and validated with a non-linear plant-wide dynamic model.
The selected projects represent a total investment of $6.5m (£4.2m), with nearly $5m from the DOE and the remaining $1.5m in cost share provided by the recipients.
Promoted content: Does social media work for engineers – and how can you make it work for you?
So in addition to doing their own job, engineers are expected to do the marketing department´s work for them as well? Sorry, wait a minute, I know the...