Double ship order
Vane Line Bunkering has awarded Manitowoc Marine Group a contract for the construction of a 480-foot, 145,000-barrel, double-hulled hot oil tank barge and a 6,000-horsepower tug.

has awarded Wisconsin-based
(MMG) a contract for the construction of a 480-foot, 145,000-barrel, double-hulled hot oil tank barge and an accompanying 6,000-horsepower tug.
The ocean-going articulated tug and barge (AT/B) unit is slated for delivery in fourth quarter of 2006. This contract also provides Vane Brothers with an option for an identical AT/B unit to be delivered in the third quarter of 2007. Other contract terms were not disclosed.
The Vane contract represents the eleventh double-hulled barge and fourth ocean-going tug to be built by Manitowoc Marine Group. Both tug and barge, which will serve the mid-Atlantic petroleum markets, will be classified in compliance with ABS, Coast Guard, and OPA-90 standards.
"This barge is nearly three times the size of any vessel in our fleet, and
Register now to continue reading
Thanks for visiting The Engineer. You’ve now reached your monthly limit of news stories. Register for free to unlock unlimited access to all of our news coverage, as well as premium content including opinion, in-depth features and special reports.
Benefits of registering
-
In-depth insights and coverage of key emerging trends
-
Unrestricted access to special reports throughout the year
-
Daily technology news delivered straight to your inbox
Taking steps toward reindustrialisation
High value is not the same as high cost/price and does not need excessive automation. Appropriate and innovative manufacturing tools are what led (in...