Aker Kvaerner wins Statoil contract

Aker Kvaerner has been awarded a contract for front end engineering design of the floating production unit for Statoil's Gjøa project in the
The field development will be based on a semi-submersible production facility to operate in waters 380 metres deep. Aker Kvaerner Engineering & Technology, a provider of engineering and construction services, will perform the NOK 60 million engineering work in
The engineering work will start immediately and continue through September 2006. Approximately 100 engineers will be working on the study at peak manning. The work will form the technical basis for subsequent engineering, procurement and construction type contracts for the semi-submersible platform.
The Gjøa reservoir was proven in 1989 in the Fensfjord formation and contains gas with a relatively thin oil zone. Gjøa is operated by Statoil in the development phase and Gaz de France in the operation phase.
Register now to continue reading
Thanks for visiting The Engineer. You’ve now reached your monthly limit of news stories. Register for free to unlock unlimited access to all of our news coverage, as well as premium content including opinion, in-depth features and special reports.
Benefits of registering
-
In-depth insights and coverage of key emerging trends
-
Unrestricted access to special reports throughout the year
-
Daily technology news delivered straight to your inbox
Radio wave weapon knocks out drone swarms
Probably. A radio-controlled drone cannot be completely shielded to RF, else you´d lose the ability to control it. The fibre optical cable removes...